Off-grid solar systems in Lahore and Punjab

No grid. No bill. Solar plus a large battery bank powers everything. Built for farms, tube wells, construction sites and anyone wanting full energy independence.

CM Punjab subsidy eligible for solar tube wells

Where off-grid wins

Off-grid is not the default for a typical Lahore home. Hybrid is usually cheaper for the same comfort. But three situations genuinely call for it:

  1. Solar tube wells and agri pumping. No mains needed. The CM Punjab Solarization Program offers a 75-80 percent subsidy on approved tube well systems through agripunjab.gov.pk. This is the largest off-grid use case in the province.
  2. Construction sites and temporary structures. Faster to set up than running a service line. Demobilizes cleanly.
  3. Energy-independence buyers. Anyone who explicitly does not want a grid connection. Rural farmhouses, remote properties.

How off-grid is different from hybrid

An off-grid system must handle 100 percent of the load with no fallback. That means:

Example: 10 kW off-grid for a farmhouse

ComponentSpecIndicative price
Panels (18 × 585 W)Tier-1 bifacialPKR 380,000
Off-grid hybrid inverter10 kWPKR 480,000
Lithium battery20 kWh (LiFePO4)PKR 950,000
Structure, cabling, MCBs, SPDPKR 240,000
Install + commissioningPKR 180,000
TotalPKR 2,230,000 – 2,540,000

Tubular battery substitution reduces the battery line by about 35 percent but shortens replacement cycle to 4-5 years.

Need an off-grid setup quoted?

Send the site location and load list on WhatsApp. A right-sized BoQ comes back the same day.

WhatsApp Quote

Solar tube well systems

The standard configuration is 10 to 25 kW direct-drive (no battery — pump runs only during sun-hours), or 15-30 kW with a small battery for late-evening watering. The CM Punjab subsidy covers most of the cost for eligible farmers. Solar Installation Lahore handles the paperwork plus the install.

What to expect during install

Off-grid sites are typically remote. Materials are trucked, hand-carried where needed and assembled on-site. A 10-15 kW off-grid job runs three to five days. Commissioning includes a load test, a depth-of-discharge check on the battery and a programmed generator-start sequence if a generator is on-site.

Free site survey across Punjab

Off-grid surveys cover load measurement, sun-hour confirmation and battery sizing.

Book a survey